NewsNewington GA Evaluates Bio-Domes – Feb. 2012

February 15, 2012by admin
https://secureservercdn.net/45.40.150.136/s3q.021.myftpupload.com/wp-content/uploads/2011/05/1024x512-wcs-latest-news1EXP-768x384-1.jpg?time=1593711653

Intrigued by the cost-saving potential of the Bio-Domes the town of Newington GA has commissioned a pilot study to be performed at their wastewater lagoons to prove the Bio-Domes are capable of meeting their effluent limits while simultaneously utilizing the existing infrastructure. The pilot study will run for at least 6 months to evaluate performance in both cold and warm weather.

Contact us now to get quote

Contact us now to get quote

Contact Us

888-292-9111
(888) 388-5774
Michael@bio-domes.com
P.O. Box 367 Lehi, UT 84043
11322 Center Highway Irwin, PA 15642

Service Agent

1-888-292-9111
https://secureservercdn.net/45.40.150.136/s3q.021.myftpupload.com/wp-content/uploads/2020/06/WCS-AWARD-TRANSPARENT.png?time=1593711653