Faced with a proposal for a $2 Million Dollar mechanical plant, Archie MO began looking for alternatives to help them meet their winter ammonia limits. After contacting WCS, it was determined that 20 Bio-Domes could solve their problem at a total installed cost of around $150,000. After receiving approval from the Missouri DNR, Archie decided to install the full-scale system as a pilot study in order to get final approval from the state for the system.



