Quincy, CA Initiates Pilot study to Evaluate Bio-Domes – Jun. 2012

In an effort to avoid a costly expansion of the existing RBC treatment system, Quincy CA has commissioned a 12 month pilot study to evaluate the Bio-Domes as a polishing step in the existing storage lagoons. The pilot unit was delivered to Quincy in the beginning of June and will operate through all 4 seasons to provide the community with the ability to evaluate the performance of the Bio-Domes.

© 2026 Wastewater Compliance Systems. All rights reserved. / Web Design by Exxcelrank.com