Intrigued by the cost-saving potential of the Bio-Domes the town of Newington GA has commissioned a pilot study to be performed at their wastewater lagoons to prove the Bio-Domes are capable of meeting their effluent limits while simultaneously utilizing the existing infrastructure. The pilot study will run for at least 6 months to evaluate performance in both cold and warm weather.



