WCS Completes New Castle, VA Installation – Apr. 2012

After a successful pilot study in New Castle, VA during the summer of 2011; WCS received a P.O. for the full scale system in December 2011 and delivered the 52 units for installation in April. While the ultimate system will involve covering the final cell of their lagoons with Bird Balls, New Castle intends to operate the lagoon for a few months without in order to evaluate the performance of the Bio-Domes, with respect to TSS reduction, without the Bird Balls.

© 2026 Wastewater Compliance Systems. All rights reserved. / Web Design by Exxcelrank.com